{"id":601,"date":"2020-05-12T10:49:09","date_gmt":"2020-05-12T10:49:09","guid":{"rendered":"http:\/\/demo.sparklewpthemes.com\/constructionlight\/checkout\/"},"modified":"2025-12-22T11:41:43","modified_gmt":"2025-12-22T04:41:43","slug":"aggeodrill","status":"publish","type":"page","link":"https:\/\/thi.co.id\/hydrocore\/aggeodrill\/","title":{"rendered":"MV AG GEODRILL & TH25M DRILL RIG IN PICTURES"},"content":{"rendered":"\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\"\"\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t\t\t\t\t
<\/figure>\n

<\/p>\n

<\/p>\n

<\/figure>\n
\"\"<\/figure>\n

<\/p>\n

<\/p>\n

\"\"<\/figure>\n

<\/p>\n

<\/p>\n

OFFSHORE GEOTECHNICAL VESSELS<\/strong><\/h3>\n

<\/p>\n

<\/p>\n

    \n
  • Dedicated Geotechnical Vessel: MV AG Geodrill<\/strong>:<\/li>\n
  • Navigation System: GPS (primary, secondary, tertiary), Gyrocompas, Echosounder.<\/li>\n
  • 4 point Mooring System to stabilize vessel position<\/li>\n
  • 4 Spud Legs available: to avoid anchoring work in tidal affected area<\/li>\n
  • TH25M heave compensated drill rig.<\/li>\n
  • Drill derrick built over a moonpool<\/li>\n
  • Heave compensated drill string assembly<\/li>\n
  • Seabed Frame (SBF) (provided with a pipe clamp), handled with tensioned lifting wires<\/li>\n
  • Accommodations for max. 38 person<\/li>\n
  • Medical Clinic room<\/li>\n
  • Onboard Soil Laboratory including Storage<\/li>\n
  • Safety Equipment<\/li>\n<\/ul>\n
    \u00a0<\/div>\n

    <\/p>\n

    <\/p>\n

    <\/p>\n

    <\/p>\n

    th25 m drll RIG specification and capability<\/strong><\/h3>\n

    <\/p>\n

    <\/p>\n

    SPECIFICATION:<\/strong><\/p>\n

      \n
    • Primary Power Pack: 500 KW Electrical HPU<\/li>\n
    • Passive Heave Compensator: HP air over water based oil inline system with 3 m stroke, mechanical lock for safe tripping and handling pipe<\/li>\n
    • Power Swivel: Eurodrill CH3200 with p=280 bar, max. torque 15100 Nm, 900 RPM, hollow ID (bore) 135 mm.<\/li>\n
    • Man riding Rooster Box style working Platform to facilitate deployment of wireline tools through the power swivel<\/li>\n
    • Derrick: Total height 18 m with SWL 25 ton.<\/li>\n
    • Drilling Pipe: 450m \u2013 5.5\u201d with 6m length API Pipe and 7\u201d dia. Colar Pipe.<\/li>\n
    • Seabed Frame: 11 ton with 6\u201d guide tube equipped with hydraulic clamp<\/li>\n
    • Hydraulic Winch: Draw Work: 1 ton; Wireline Winch: 6 ton; SBF: 15 ton.<\/li>\n
    • MK TEE 165 Pumps Petrodrill (mud pump), capacity 522.4 ltr\/min (138gpm) @ 120.1 bar (1742 psi),<\/li>\n
    • Mud Tanks with two compartments storage tank bentonites \/ guar gum seawater miscible<\/li>\n<\/ul>\n
      \u00a0<\/div>\n
      GEOTECHNICAL SAMPLING; CORING & INSITU TESTING:<\/span><\/div>\n
        \n
      • Downhole configuration (Sampling and In-situ \/PCPT)<\/li>\n
      • Sampling using wireline WIP Piston, Push, Hammer samplers with its BHA<\/li>\n
      • Rock coring using wireline triple core barrel HQ3.<\/li>\n
      • Downhole wireline AP Van Den Berg Wison CPT System with 5 ton (3m stroke) or 10 ton (1m stroke) capacity tests,<\/li>\n
      • Suspension P-S Velocity Logging using PS Logger Probe.<\/li>\n<\/ul>\n

        <\/p>\n

        <\/p>\n

        <\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t

        \n\t\t\t\t\t\t
        \n\t\t\t\t\t
        \n\t\t\t
        \n\t\t\t\t\t\t
        \n\t\t\t\t
        \n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\"\"\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"

        OFFSHORE GEOTECHNICAL VESSELS Dedicated Geotechnical Vessel: MV AG Geodrill: Navigation System: GPS (primary, secondary, tertiary), Gyrocompas, Echosounder. 4 point Mooring System to stabilize vessel position…<\/p>\n","protected":false},"author":1,"featured_media":1018,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"h5ap_radio_sources":[],"footnotes":""},"class_list":["post-601","page","type-page","status-publish","has-post-thumbnail","hentry"],"_links":{"self":[{"href":"https:\/\/thi.co.id\/hydrocore\/wp-json\/wp\/v2\/pages\/601","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/thi.co.id\/hydrocore\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/thi.co.id\/hydrocore\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/thi.co.id\/hydrocore\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/thi.co.id\/hydrocore\/wp-json\/wp\/v2\/comments?post=601"}],"version-history":[{"count":17,"href":"https:\/\/thi.co.id\/hydrocore\/wp-json\/wp\/v2\/pages\/601\/revisions"}],"predecessor-version":[{"id":1945,"href":"https:\/\/thi.co.id\/hydrocore\/wp-json\/wp\/v2\/pages\/601\/revisions\/1945"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/thi.co.id\/hydrocore\/wp-json\/wp\/v2\/media\/1018"}],"wp:attachment":[{"href":"https:\/\/thi.co.id\/hydrocore\/wp-json\/wp\/v2\/media?parent=601"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}