2D/3D HR MARINE SURVEY & OTHERS GEOPHYSICAL SERVICES

  • Provision Of Geophysical And Shallow Geotechnical Site Investigation Services (2023)
  • Geohazard Survey Services – Call 5 (PHE ONWJ – 2023)
  • Geohazard Survey Services – Call 4 (PHE ONWJ – 2022)
  • Geohazard Survey Services – Call 3 (PHE ONWJ – 2022)
  • Geophysical & Geotechnical and Other Related Services (2022)
  • Geohazard Survey Services – Call 2 (PHE ONWJ – 2022)
  • Geophysical & Geotechnical and Other Related Services (2022)
  • Geophysical & Geotechnical and Other Related Services (2021)
  • Change Order of Bathymetric, Geophysical and Offshore Geotechnical Survey Services at Cirata 145MW Floating Solar Power Project (Additional 12 CPT Points) – PLTU CIRATA – 2021
  • Geohazard Survey Services – Call 1(PHE ONWJ – 2021)
  • Geotechnical, Bathymetric & Geophysical Survey Services at Cirata 145MW Floating Solar Power Project (PLTU CIRATA – 2021)
  • High Resolution Marine Seismic Survey Services, East Seram PSC – Offshore KOBI & BULA at Eastern Seram Island Province of Maluku, Oct 2020 (Client : Balam Energy Pte Ltd)
  • Bathymetry Acquisition Services, East Seram PSC – Offshore KOBI & BULA at Eastern Seram Island Province of Maluku, Oktober 2020 (Client : Balam Energy Pte Ltd)
  • UHR/HR Seismic Survey for Mahoni, Sepinggan Sierra, Sepinggan Rajah, Sejadi & Serang Baru Locations Of Kalimantan Timur, September – Oktober 2020 (Client : PHKT, Kalimantan)
  • Geophysical & Geotechnical and Other Related Services, Natuna Sea-Kepulauan Riau, Aug 2020 (Client : Medco E&P Natuna Ltd)
  • Marine Site Survey : Intake,Outfall and Jetty Wharf, Bathymetry Survey, Manual Sounding, SBP Hi-RES Survey and Seabed Sampling For Central Java Power Plant Project at Batang Central Java, Jan 2020 (Client : PT. Hydrocore for Mitsui Engineering and Ship Building Co.Ltd)
  • Marine Survey for Bathymetric, Seabed Hi-Res Sub bottom Profilling, Magnetometer and Geotechnical Investigation Analysis at area of Pipelines Plan and LNG Trestle Jetty Plan Central Java Power Plant Project at Batang Central Java, Feb 2019 (Client : PT. Hydrocore for Wakachiku Contruction Co.Ltd)
  • Geotechnical, Bathymetrical & Geophysical and Hydrometeorological Survey OFFSHORE -Onshore Penajam East Kalimantan. May 2017 ( Client : PT Kereta Api Borneo).
  • Bathymetric Survey for Chipmill Jetty at Kariangau Balikpapan River, Kalimantan Timur (client: PT. Fajar Surya Swadaya – PT Djarum Group), 2010.
  • Vibrocoring Work (230 point, up to 500m water depth) for Pertamina Matindok Geochemistry study (client : PT. MGS), in 2011