OFFSHORE GEOTECHNICAL SURVEY USING MV AG GEODRILL

  1. Offshore Geotechnical Survey Work for 1st Called “Geophysical & Geotechnical and Other Related Services” in Natuna Sea, Kepri, Indonesia, Client: Medco E&P Natuna Ltd, 26 June – 13 Aug 2020.
  2. OFfshore Geotechnical Survey Work for Front-End Engineering Design (FEED) for Project Bromo in East Java, Indonesia, Client: Intecsea/Worley Group, 9-25 May 2020.
  3. Offshore Geotechnical Survey Services for Offshore Lawe-Lawe Facilities Project at RDMP RU V Pertamina Balikpapan, Client: PT. LAPI ITB, 11 Mar – 15 Apr 2020.
  4. 2nd Campaign Geotechnical Survey Services for Jack-up Rig locations near Kerindingan Platform and additional for Pertamina Hulu Kalimantan Timur. Client: PT. Seascape Surveys Indonesia, 28 Jan – 25 Feb 2020;
  5. Offshore Geotechnical Survey Services for Parang-2 Bunyu of PHE Nunukan, Client: PT. Java Offshore-PT PHE Nunukan, 14-24 Jan 2020.
  6. 2nd Campaign Geotechnical Survey Services for Jack-up Rig location at Seguni-A at Sepinggan Field, Santan STA at Santan Field and Victor at Sepinggan Field, Well Exploration for Pertamina Hulu Kalimantan Timur. Client: PT. Seascape Surveys Indonesia-PT Pertamina Hulu Kalimantan Timur, 18 Dec 2019 – 13 Jan 2020;;
  7. Offshore Geotechnical Survey for MOPU Location at MBH FIELD Madura Strait, East Java, Client: HCML (Husky Cnooc Madura Limited), 28 Nov – 07 Dec 2019.
  8. Survey Services Offshore Soil Investigation for Toll Sea Bridge, Balikapapan Bay, Penajam, East Kalimantan, Client: PT Waskita Karya, 23 Sept – 07 Nov 2019;
  9. 1st Campaign Geotechnical Survey Services for Jack-up Rig location at Seturian 10, Seturian Well Exploration for Pertamina Hulu Kalimantan Timur. Client: PT. Seascape Surveys Indonesia-PT Pertamina Hulu Kalimantan Timur, 7-22 Sept 2019;
  10. Geotechnical Survey Services, Geotechnical Soil Boring, 2019 YYA-1 Relief Well at Java Sea (Karawang) Client: PT Pertamina Hulu Energi Offshore North West Java (PHE ONWJ), 24-29 July 2019;
  11. 2nd Campaign Survey Soil Investigation for New SPM at Pertamina Pengapon Project at Pengapon Semarang, Client: PT Surveyor Indonesia (Persero)-PT Pertamina, 5-13 July 2019;
  12. Geotechnical Survey Services, Geotechnical Soil Boring, 2019 EXPLORATION WELL NWY-1 at Java Sea (Kepulauan Seribu) Client: PT Pertamina Hulu Energi Offshore North West Java (PHE ONWJ), 29 June – 4 July 2019;
  13. 2nd Campaign Offshore Geotechnical Survey for Central Java Power Plant Project on Intake and Outfall Line, at Batang, Central Java, Client: Mitsui Engineering & Shipbuilding Co. Ltd, in 3-18 Feb 2019;
  14. Offshore Geotechnical Survey for Central Java Power Plant Project on Intake and Outfall Line, at Batang, Central Java, Client: Mitsui Engineering & Shipbuilding Co. Ltd, in 22 Aug – 29 Sept 2018;
  15. Offshore Geotechnical Survey for PHE WMO nearby PHE-12 Platform at Madura Block, East Java, Client: PT Elnusa Tbk, 1st called 11-21 Aug 2018;
  16. Provision of Geotechnical Survey and Services, Offshore Geotechnical Survey for WHP-C and WHP-D worksites (1st Call) at Pangkah PSC Block East Java, Client: Saka Indonesia Pangkah Ltd, PT. Saka Indonesia Sesulu, PT. Saka Energi Wokam, first called 29 July – 7 Aug 2018;
  17. Offshore Geotechnical Survey for PLTGU Jawa 1 CCPP IPP Project, Cilamaya Subang, West Java Client: PT Meindo Elang Indah, 7-14 July 2018;
  18. Offshore Geotechnical Survey for FEED OF MULTI COLUMN TENSION LEG PLATFORM IN L-PARIGI FIELD, SUBANG; at Lima Area Parigi, Subang, West Java, Client: Technip FMC, 24-28 February 2018;
  19. Nearshore and Offshore Geotechnical Survey for SPL and SPM PERTAMINA REFINERY UNIT VI BALONGAN PROJECT, Balongan, West Java, Client: PT ITS Tekno Sains, 4-23 Feb 2018;
  20. Marine Geotechnical Investigation (Inter tidal & offshore) of New 2nd Jetty for BP TANGGUH EXPANSION PROJECT, Client: CSTS (Chiyoda, Saipem, Tripatra, SAE) Joint Operation, in 22 Dec 2017 – 13 Jan 2018;
  21. 1st Campaign Survey Soil Investigation for SPM at Pertamina Pengapon Project at Pengapon, Semarang, Client: PT Surveyor Indonesia (Persero)-PT Pertamina, 21-29 Sept 2017;
  22. Offshore Geotechnical Survey for Jack-up Rig of PHE ABAR, Client: PT Alamjaya Makmur Sejahtera-PT PHE Abar, 5-20 Sept 2017;
  23. Nearshore Geotechnical Survey for LNG CARRIER JETTY Project (KITe) at Lombok, Client: PT. Patra Drilling Contractor, in early 30 Sept – 17 Oct 2017;
  24. Nearshore Geotechnical Survey for FSRU Project (KITe) at Makassar, Client: PT. Patra Drilling Contractor, in 12 Aug – 2 Sept 2017;
  25. Nearshore and Offshore Geotechnical Survey for SPL/SPM Pertamina UP VI Balongan West Java, Client: PT Pageo Utama-PT Pertamina UP VI, in Jan-Feb 2017.;